Tab pole piece comprising four weeks are required to confirm the burrs. <br><br>After 4 confirm, <br><br>set 2,3,4 sheet removal, <br><br>the first one rotated 180 degrees, <br><br>so that the green side up examination burrs.
The polar plate around contains the polar ear to confirm the burr.<br><br>After 4 pieces are confirmed,<br><br>Please remove the 2nd, 3rd, and 4th pieces,<br><br>Turn the first piece 180 degrees,<br><br>Check the green area for burrs up.
Confirm the burr around the pole piece including the pole lug.<br>After 4 pieces are confirmed,<br>Please remove the 2nd, 3rd and 4th tablets,<br>Turn the first piece 180 degrees,<br>Check the burr with the green part upward.<br>