Painting + printing, after overtime in these two days to completely dry, 8/24 plastic back final processing factory, 8/25 arrange packaging inspection, 8/26 arrival.
Painting + print, after two days to completely dry after overtime, 8/24 back to do the final processing Plastic Factory, 8/25 arrangements for inspection of packaging, 8/26 arrival.
spray-paint printing, the two days after doing overtime to completely dried, 8/24 back plastics factory for final processing, 8/25 arrangements packaging testing, 8/26 to cargo.