When the amount of staff using the meter assembly was found to have K1 P / N:. RFK-2B-112 PIN 1.3.8 should foot path for ground point, is poor contact ground point,
When assembling, the staff used meter measurement to find K1 P/N:RFK-2B-112. PIN foot 1.3.8 should be the access point, the current contact location is not good,
During assembly, the staff used the electricity meter to measure and found K1 P / N: rfk-2b-112 Pin pin pin 1.3.8 should be the grounding channel, and the current grounding point is in poor contact,<br>