Platform door body: the current factory assembled the entire group of dock door system, is expected in February 2017 to perform audits of overseas plant measured with the owners
Platform door body: at present, the whole set of system is assembled in the factory, and it is expected to cooperate with the owner to carry out the audit of the overseas factory survey in February 2017.