The pile driver can drive the pile into the ground to support the structure of underground station or tunnel.<br>Immersed tube tunnel<br>The length of the sea crossing section of SCL is 1.7km, which is mainly constructed by immersed tunnel method. It consists of 11 prefabricated members, each of which is about 160m long.<br>
正在翻譯中..
