Handling beyond the allowable difference: The necessary remedial measures shall be handled in accordance with the instructions of the Engineering Department, and the cost shall be borne by the contractor.
Treatment of exceeding the allowable deviation: take necessary remedial measures according to the instructions of the engineering department, and the cost shall be borne by the contractor.<br>