1. ground improvement <br>2. piling and foundation (at The Original Content Should BE REVISED ACCORDING to at The Technical Specifications.) <br>3. official work station area road paving and drainage systems <br>(1) · · · <br>(2) In accordance with the function and pavement There are four types of use of the area, the need to consider the economic aspects of heavy concrete pavement load and light load concrete pavement. <br> heavy load of concrete pavement (deleted) <br> lightweight concrete pavement load (deleted) <br> asphalt pavement (deleted) <br> gravel surfacing (deleted) <br>(3) · · · · ·
正在翻譯中..