10) mold in place, click the "glue" button, open safety valve, pressure regulating valve, the proper air pressure is applied to the safety valve; right hand speed setting, press the right button glue injection, view mould note glue channel is blocked;11) to remove the mold, after clamping in place, to die a screw loose, let die strip out of the mold, then move mold button removed mold.
正在翻譯中..