Based on the actual construction drawings and checklists provided by the contractor (MC), the scope not included in the construction drawings will be quoted separately
Based on the actual construction drawings and lists provided by the contractor (MC), additional quotations will be made within the scope of the construction drawings
According to the actual construction drawings and list provided by the contractor (MC), the scope not included in the construction drawings will be quoted separately<br>