20.7.8 下列圖示範圍內之冷能冰水管線施作需配合台中電廠第九、十號機之大修期間進場施工,不得影響機組之運轉,其工序及內容如下:1. 完成的英文翻譯

20.7.8 下列圖示範圍內之冷能冰水管線施作需配合台中電廠第九、十號

20.7.8 下列圖示範圍內之冷能冰水管線施作需配合台中電廠第九、十號機之大修期間進場施工,不得影響機組之運轉,其工序及內容如下:
1. 完成該路段2條臨時灰管之施作,並確認可供煤灰輸送使用。
2. 將既有之2條輸灰管拆除並妥善保管存放。
3. 依設計圖面進行打樁、冰水管線、既有之2條輸灰管及管架等施工、安裝相關工作。
4. 拆除臨時灰管並將輸灰管線銜接至永久管線,並確認可供煤灰輸送使用。
0/5000
原始語言: -
目標語言: -
結果 (英文) 1: [復制]
復制成功!
20.7.8 The following illustrates the scope of the cold ice-water line can be applied to plants must comply with the ninth station, entering the construction of the machine during a size ten overhaul, it can not affect the operation of the unit, which processes and as follows: <br>1. Complete the road 2 facilities for the temporary pipe ash, and coal ash delivery confirmation for use. <br>2. The two existing ash removal and keep the tube store. <br>3. piling according to the design surface, ice-water line, both of the two pipes and ash racks construction, installation and related work. <br>4. Remove the temporary pipe ash and ash cohesion permanent line to line, and delivery confirmation for the use of coal ash.
正在翻譯中..
結果 (英文) 2:[復制]
復制成功!
20.7.8 The application of the cold-energy ice water pipeline within the following icons shall be carried out in conjunction with the construction of the Taichung Power Plant's 9th and 10th machines during the major repairs, and shall not affect the operation of the unit, the process and contents of which are as follows:<br>1. Complete the application of 2 temporary ash tubes on this section of the road and confirm that it is available for coal ash transport.<br>2. Remove the existing two ash tubes and keep them in storage.<br>3. According to the design surface to piling, ice water pipeline, the existing 2 ash pipe and pipe frame and other construction, installation-related work. 4. Remove the temporary ash pipe and connect the ash pipeline to a permanent pipeline and confirm that it is ready for coal ash transport.
正在翻譯中..
結果 (英文) 3:[復制]
復制成功!
20.7.8 the construction of cold energy ice water pipeline within the scope of the following icons shall be carried out in coordination with the Mobilization Construction during the overhaul of No. 9 and No. 10 units of Taichung power plant, and shall not affect the operation of the unit. The procedures and contents are as follows:<br>One Complete the construction of 2 temporary ash pipes in this road section, and confirm that they can be used for ash transportation.<br>Two Remove the two existing ash conveying pipes and store them properly.<br>Three Pile driving, ice water pipeline, two existing ash pipes and pipe racks shall be constructed and installed according to the design drawing.<br>Four Remove the temporary ash pipe and connect the ash pipeline to the permanent pipeline, and confirm that it can be used for ash transportation.<br>
正在翻譯中..
 
其它語言
本翻譯工具支援: 世界語, 中文, 丹麥文, 亞塞拜然文, 亞美尼亞文, 伊博文, 俄文, 保加利亞文, 信德文, 偵測語言, 優魯巴文, 克林貢語, 克羅埃西亞文, 冰島文, 加泰羅尼亞文, 加里西亞文, 匈牙利文, 南非柯薩文, 南非祖魯文, 卡納達文, 印尼巽他文, 印尼文, 印度古哈拉地文, 印度文, 吉爾吉斯文, 哈薩克文, 喬治亞文, 土庫曼文, 土耳其文, 塔吉克文, 塞爾維亞文, 夏威夷文, 奇切瓦文, 威爾斯文, 孟加拉文, 宿霧文, 寮文, 尼泊爾文, 巴斯克文, 布爾文, 希伯來文, 希臘文, 帕施圖文, 庫德文, 弗利然文, 德文, 意第緒文, 愛沙尼亞文, 愛爾蘭文, 拉丁文, 拉脫維亞文, 挪威文, 捷克文, 斯洛伐克文, 斯洛維尼亞文, 斯瓦希里文, 旁遮普文, 日文, 歐利亞文 (奧里雅文), 毛利文, 法文, 波士尼亞文, 波斯文, 波蘭文, 泰文, 泰盧固文, 泰米爾文, 海地克里奧文, 烏克蘭文, 烏爾都文, 烏茲別克文, 爪哇文, 瑞典文, 瑟索托文, 白俄羅斯文, 盧安達文, 盧森堡文, 科西嘉文, 立陶宛文, 索馬里文, 紹納文, 維吾爾文, 緬甸文, 繁體中文, 羅馬尼亞文, 義大利文, 芬蘭文, 苗文, 英文, 荷蘭文, 菲律賓文, 葡萄牙文, 蒙古文, 薩摩亞文, 蘇格蘭的蓋爾文, 西班牙文, 豪沙文, 越南文, 錫蘭文, 阿姆哈拉文, 阿拉伯文, 阿爾巴尼亞文, 韃靼文, 韓文, 馬來文, 馬其頓文, 馬拉加斯文, 馬拉地文, 馬拉雅拉姆文, 馬耳他文, 高棉文, 等語言的翻譯.

Copyright ©2024 I Love Translation. All reserved.

E-mail: