Action to be taken after the suspension typhoon signal <br>(e) all workers cages and material hoists have to be parked at the entrance floor, while all machinery and appliances should be shut off. <br>(f) After completion of all temporary protection facilities work, instruct all employees to leave the site until the signal is lowered to lower it. <br>(g) All site staff after the withdrawal of the site, each distributor of the total catch need to be closed, only to make room for offices disc contact communication. <br>(h) All sites inlet should be kept closed to prevent outsiders, dangerous.
正在翻譯中..
