It is a kind of multi-faceted construction tool, which is used to excavate and remove the excavated materials and install reinforced concrete lining in the tunnel. This method is different from foundation pit and foundation pit, and does not need to destroy the road in the construction process. In the design stage of tunnel construction, the tunnel will be divided into different parts.<br>
正在翻譯中..
