Before pouring concrete for steel pipe piles and steel pipe sheet piles, the bottom mold should be blocked and the seawater should be drained before pouring.
Before concrete pouring of steel pipe pile and steel pipe sheet pile, the bottom formwork shall be blocked and the sea water shall be drained before pouring.<br>