Previously, two pressure valves were replaced in October, and SJX wanted to confirm whether the aircraft's fault message was caused by a pressure valve failure.
Previously, two pressure valves were replaced in October, and SJX wanted to confirm whether the aircraft's fault information was caused by a pressure valve malfunction
Two pressure valves were replaced in October before, and SJX wanted to confirm whether this fault message of the aircraft was caused by pressure valve failure.