The contractor shall notify the engineering department before [3 days] and prepare the transportation means in conjunction with the random inspection of the engineering department.
In conjunction with the Engineering Department, the contractor shall notify the Engineering Department of the work by the time of the inspection and prepare the tools for delivery.