HS re-design surface below the map, and now ME, ECAD, power team to reach a consensus <br><br>ME, Graph complete, has been drawing on manufacturers to assess the feasibility of the process
HS redesign surface into the figure below, has now reached agreement with ME, ECAD, power team<br><br>ME, completed, has been given to the manufacturer to assess the feasibility of the process
HS redesigns the drawing into the following figure, and has reached a consensus with me, ECAD and power team<br>Me, the drawing is completed, and the drawing has been submitted to the manufacturer to evaluate the feasibility of the process<br>