The measurement results should be reviewed by the Engineering Department, but the responsible contractor for accurate measurements should still be responsible.
The measurement results should be reviewed by the Engineering Division, but the contractor responsible for accurate measurements shall remain responsible.
The measurement results shall be reviewed by the engineering department, but the Contractor shall be responsible for the accuracy of the measurement.<br>